Friday, November 20, 2015

Courtenay Spends $100,000 On Flood Mitigation

$100,000 For 400 metres of flood control

Courtenay Mayor and CAO were present for the testing of a new flood control system intended to mitigate flooding risks to local area residents and businesses.

The system is a heavy bladder which can be filled rapidly with water to create a barrier against flood water more quickly and effectively than sandbagging.

The system in Courtenay is 400 metres long and 1 metre high and can be filled either from a lake or river or hydrants. The system comes with pumps for rapid deployment and the entire package has cost the city $100,000.

 CHEK News Aqua Dam
To view the CHEK News video clip, click the above image.

allvoices

1 comment:

  1. Isn't this just a variant of the over-topping barrier suggested by Councillor Kipp along with the dam back hardening proposed by GSI?

    ReplyDelete

Your comment will appear after moderation before publishing,

Thank you for your comments.Any comment that could be considered slanderous or includes unacceptable language will be removed.

Thank you for participating and making your opinions known.

Note: only a member of this blog may post a comment.